Wednesday, March 3, 2010

Well things have quited down a bit so I have been working on the back shop building. Most of the roof is now installed ready for the tar and gravel to be applied. Before that happens the rest of the sawtooth sky lite's will have to be installed. I will have to find some fore material for windows in the sky lites as I forgot to bring that with me this time. I will try and post some pictures in the next day or two.